Bathroom + En suite

The client required both bathroom and en suite renovating in their only 5 year old home due to the previously fitted bathrooms failing.

An all tiled en suite with half height tiled bathroom with matching fixtures and fittings in both rooms. To prevent any water escaping from wet areas, walls had been waterproofed with tanking kits prior to tiles fitted.

If you’re unsure of water escaping from your shower, feel free to get in touch.

Check out the finished articles of both bathroom renovations…

Fitted furniture – Concealed thermostatic rainfall shower – Walk in shower – Designer radiator – LVT, Luxury vinyl tile flooring – Spotlights – Wall tiling